Home > Term: net change master scheduling
net change master scheduling
A master scheduling principle in which net requirements are calculated only for items that have had a change in demand since the last master schedule was calculated.
- Sõnaliik: noun
- Valdkond/domeen: Computer
- Category: Operating systems
- Company: Microsoft
0
Looja
- Romain
- 44.44% positive feedback