Home >  Term: low power testing
low power testing

The period of time between a plant's nuclear generating unit's initial fuel loading date and the issuance of its operating (full-power) license. The maximum level of operation during this period is 5 percent of the unit's thermal rating.

0 0

Looja

  • Pud6
  •  (Gold) 2324 points
  • 100% positive feedback
© 2025 CSOFT International, Ltd.