Home > Term: Greenwell formula
Greenwell formula
A formula used for calculating the thickness of tubbing: T = 0.03 + HD/50,000, where T is the required thickness of tubbing in feet, H is the vertical depth in feet, D is the diameter of the shaft in feet, and 0.03 is an allowance for possible flaws or corrosion.
- Sõnaliik: noun
- Valdkond/domeen: Mining
- Category: General mining; Mineral mining
- Government Agency: USBM
0
Looja
- ed.young
- 100% positive feedback
(Milwaukee, United States)